| 1948 |
 |
First Soviet production reactor A |
| 1951 |
 |
Production reactor AI |
| 1954 |
 |
The world's first NPP with water-cooled graphite-moderated pressure-tube reactor |
| 1955 |
 |
Production reactor I-1 |
| 1956 |
 |
Design of the first modular reactor system for a nuclear submarine (Project 639) |
| 1956 |
 |
Nuclear power facility of 27-VM test rig |
| 1958 |
 |
Nuclear power system for the first Soviet nuclear submarine |
| 1958 |
 |
Sibirsk 1 (dual-purpose reactor EI-2) |
| 1958 |
 |
First-of-the-kind research reactor IRT |
| 1961 |
 |
Pulse uranium-graphite reactor IGR |
| 1961 |
 |
SM-2 research reactor |
| 1963 |
 |
ARBUS Antarctic modular reactor plant |
| 1964-1967 |
 |
Beloyarsk NPP with pressure-tube nuclear steam superheating reactors |
| 1966 |
 |
Design of the first integral reactor system of the Navy |
| 1967 |
 |
MIR research reactor |
| 1967 |
 |
Design of a water-graphite pressure-tube reactor RBMK-1000 |
| 1969 |
 |
Modular reactor system for the world’s fastest nuclear submarine “Goldfish” |
| 1971 |
 |
One-loop prototype ground power facility VAU-6C with boiling reactor |
| 1973-1981 |
 |
Leningrad NPP (4 units) |
| 1975 |
 |
IVG1 - ground-based prototype of a nuclear power and propulsion system |
| 1976-1985 |
 |
Kursk NPP (4 units) |
| 1977-1983 |
 |
Chernobyl NPP (4 units) |
| 1982-1990 |
 |
Smolensk NPP (3 units) |
| 1982 |
 |
First-of-the-kind integral reactor system for the Navy/TD>
|
| 1983-1987 |
 |
Ignalina NPP (2 units) |
| 1984 |
 |
IBR-2 research reactor |
| 1986 |
 |
Nuclear power facility VAU-6 with boiling reactor |
| 1986 |
 |
Safety upgrades at RBMKs (since 1986) |
| 1989-1994 |
 |
Upgrading of Leningrad-1 and Leningrad-2. Phase 1 |
| 1993 |
 |
SM-3 research reactor (upgraded SM-2 reactor) |
| 1997 |
 |
Safety Parameters Display System for Kursk-2 |
| 1998-2004 |
 |
Development and installation of mechanical structures for end-cap hadron calorimeters of CMS detector (Gold Award, CERN) |
| 2000 |
 |
Design of VK-300 Reactor Facility |
| 2001 |
 |
Engineering design of nuclear systems for ITER |
| 2001-2004 |
 |
The E-391A detector project in KEK (Tsukuba, Japan) |
| 2002 |
 |
Integrated monitoring, control and protection system for Kursk-1 |
| 2002 |
 |
Design of a demonstration BREST-OD-300 plant with naturally safe reactor |
| 2004 |
 |
Second shutdown system at Leningrad 1. Control safety system for process parameters at Kursk 2 |
| 2004 |
 |
Integral nuclear steam supply system (second generation) for the Navy |
| 2003 |
 |
Leningrad-1. RBMK-1000 life extended by 15 years |
| 2005 |
 |
Leningrad-2. RBMK-1000 life extended by 15 years |
| 2006 |
 |
Kursk-1. RBMK-1000 life extended by 15 years |